MF Development Module Change Analysis Period from 10 Yrs
-
Anonymous
Inactive7 years, 5 months ago #2452If I am in the Construction module and switch the analysis date (Summary tab “Analysis_Length_Years”) value to anything but 10 years, model busts (#value issue everywhere)
Thoughts?
Anonymous
Inactive7 years, 5 months ago #2836It seems to be an issue in the perm debt (reversion) but not sure
Spencer Burton
Keymaster7 years, 5 months ago #2838Thanks for pointing this out. I’d failed to make the Stabilization calc formulas dynamic to the analysis period length. Thus, any period other than 10 errors out the Stabilization date. I’ve updated the model and uploaded the corrected version.
As a fix for earlier versions, such as the version you’re working with, just manually enter a Stabilization date on the Summary tab, and that should fix the problem.
Anonymous
Inactive7 years, 5 months ago #2840so, changing the stabilization date on summary tab doesnt fix. Did you just upload revised today?
Anonymous
Inactive7 years, 5 months ago #2842for your benefit, here is the file. Note that manually changing stab date doesnt fly.
Also, i note that the chart on the summary page, if you change analysis period it disappears.
And every time i navigate to summary page, the sheets i had opened up (eg budget, equity cf, opstmts, etc) all go back into hidden mode.Spencer Burton
Keymaster7 years, 5 months ago #2844You’re right, manually overriding the stabilization date doesn’t fix the issue.
Yes, I uploaded the fix yesterday in fact. You can find the updated file here: https://www.adventuresincre.com/?paybox-key=bglbuz93owiqwa8r
In terms of the chart disappearing, I haven’t run into that yet. Can I ask, what operating system and version of Excel are you running?
You must be logged in to reply to this topic.